Miane - Tabriz Railway (Lot 8,9)

 

Employer: Construction & Development of Transportation Infrastructure Co.

Province: East Azarbaijan

Date of Completion: Currently Completing

Top Specifications:


Length: 31 km

Bridges: 81

Tunnel Length: 700 m

Cut&Fill Volume: 11,000,000 m3

Concrete Volume: 10,400 m3

Reinforcement: 1,500 ton

Brief Description:


This project is 200 kilometer railway which branches from Miyaneh station and after going through various cities such as; Torkamanchay and Bostan-Abad, connects to the current railway of Tabriz. By completion of this project, the distance between Tabriz to Tehran will lessen about 114 kilometer and will result to considerable reduction in consumption of energy and depreciation of traffic and machinery and finally enhancement of trade.

Gallery: