Miane - Tabriz Railway (Lot 8,9)
Employer: Construction & Development of Transportation Infrastructure Co.
Province: East Azarbaijan
Date of Completion: Currently Completing
Top Specifications:
Length: 31 km
Bridges: 81
Tunnel Length: 700 m
Cut&Fill Volume: 11,000,000 m3
Concrete Volume: 10,400 m3
Reinforcement: 1,500 ton
Brief Description:
This project is 200 kilometer railway which branches from Miyaneh station and after going through various cities such as; Torkamanchay and Bostan-Abad, connects to the current railway of Tabriz. By completion of this project, the distance between Tabriz to Tehran will lessen about 114 kilometer and will result to considerable reduction in consumption of energy and depreciation of traffic and machinery and finally enhancement of trade.