Bafgh - Bandarabbas Railway
Employer: Iran Ministry of Road and Transportation
Province: Hormozgan
Date of Completion: 1993
Top Specifications:
Length: 60 km
Small Bridges: 344
Major Bridges: 43
Tunnels Lenght: 2350 m
Cut Volume: 4,850,000 m3
Fill Volume: 5,900,000 m3
Concrete Volume: 970,000 m3
Brief Description:
One of the difficult lots of Bafgh-Bandarabas rail way is lot no. 2 which has two lined infrastructure and the rail has been installed for one line and the shunting yard has been built at Bandarabs. Bridges of lot no.1 required intensive repairing because of corrosion and Rahab Consulting Engineers was the contractor for that project.